Hakkari
Dam & HEPP, Final Design
HAKKARI
(35% of HC) |
DSI |
6.9 |
2001
- 03 |
3
736
2 545 |
ha
m |
Mapping
Drilling |
Sureyyabey
(Cekerek) Dam & HEPP
YOZGAT
(25% of KEE JV) |
DSI |
191.2 |
1998
- 10 |
102.5
7 380 000
635.65
180 000
1 920
14.4 |
m
m3
m
m3
m
MW |
High
Clay core rockfill
Crest length
Concrete
Tunnel
Installed capacity |
Hatap
Dam
CORUM |
DSI |
12.4 |
1995
- 08 |
63
2 841 000
304
18 300
2 945 000
400 |
m
m3
m
m3
m3
t |
High
Fill (road-dam)
Crest length
Concrete
Excavation
Steel |
Akyar
Dam
ANKARA |
DSI |
39.0 |
1992
- 01 |
86
3 013 000
330
40 000
7 659 000 |
m
m3
m
m3
m3 |
High
Earthfill
Crest length
Concrete
Open excavation |
Erzincan
Dam
ERZINCAN |
DSI |
34.6 |
1991
- 98 |
81
5 650 000
444
21 000
4 680 000 |
m
m3
m
m3
m3 |
High
Earthfill
Crest length
Concrete
Open excavation |
Dicle
Dam & HEPP
DIYARBAKIR |
DSI |
201.5 |
1986
- 01 |
87
3 450 000
307
585 000
7 550 000
366 000 |
m
m3
m
m3
m3
m3 |
High
Rockfill
Crest length
Concrete
Open excavation
Tunnel excavation |
Mumcular
Dam
MUGLA |
DSI |
15.6 |
1985
- 91 |
32
253 000
1 410 000
834
33 700
1 660 000 |
m
m3
m3
m
m3
m3 |
High
Fill - road
Fill - dam
Crest length
Concrete
Excavation |
Hancagiz
Dam
GAZIANTEP |
DSI |
20.6 |
1985
- 89 |
52
3 280 000
1 955
1 490 000
15 200 |
m
m3
m
m3
m3 |
High
Earthfill
Crest length
Excavation
Tunnel excavation |
Maksutlu
& Yapialtin Dams
SIVAS |
DSI |
6.2 |
1975
- 77 |
|
|
Earthfill
dams |
 |
380.1 |
|