Name
and Location
of Project |
Client |
Value
($ 000 000) |
Date |
Project
Details |
Fethiye
Sewerage Network and
Pump Stations
MUGLA
(50% of KYM JV) |
FESKI |
6.1 |
2002
- 04 |
110
000
44 000
42 480 |
m3
m2
m |
Excavation
Sheet piling
HDPE - GRP Pipes
(150 - 1 000 mm dia.) |
Irrigation
System
ERZINCAN |
DSI |
26.8 |
1996
- 05 |
59
200
95 000
690
2 715 000
115 000 |
m
m
m
m3
m3 |
Concrete
lined canal
Pipe+culvert network
Tunnel
Excavation
Concrete |
Roads
- River Rehabilitation
ISTANBUL |
Municipality |
7.1 |
1994
- 96 |
182
000
13 100
12 700
565 |
m3
m3
m
t |
Excavation
Concrete
Pile
Steel |
Sewerage
Network
TRABZON |
ILLER
BANK |
17.4 |
1988
- 04 |
127
000
20 300 |
m
m |
150 -
500 mm dia. Concrete pipe
600 - 1 400 mm dia. R/f conc. pipe work |
Al Khalege
- Al Aali Irrigation Project
BAGHDAD |
Ministry
of
Irrigation |
7.8 |
1986 |
100
800 |
m |
Flume
works |
Sewerage
Network of Al Jamiah
Cont 12
JEDDAH |
W/S
Dept. |
14.7 |
1985
- 87 |
130
000
23 000
56 000
5 000 |
m3
m3
m
m |
Excavation
Concrete
300 - 100 mm dia. Pipe work
GRP |
Muqdadiya
- Diyala
Irrigation and Drainage Project
BAGHDAD |
Ministry
of
Irrigation |
19.6 |
1983
- 86 |
2
000 000
40 000
8 000
9 500
630
1 200 |
m3
m3
m3
ha
km
ea |
Excavation
Concrete lining
Concrete
Land levelling
(7 000 ha Conventional Irrigation)
100 mm dia. Drainage pipe / field drain
Manhole |
Abu
Ghraib Irrigation, Drainage and
Road Syst. Project ISKANDARIYA
BAGHDAD |
Ministry
of
Irrigation |
81.4 |
1981
- 85 |
5
050 000
3 660 000
3 060 000
576 650
79
181.5 |
m3
m2
m3
m3
km
km |
Earthwork
Concrete lining
Land levelling
(9 500 ha Conventional irrigation)
Concrete
Road with A.C. pavement
Flume works |
Abu
Ghraib Irrigation, Drainage and
Road Syst. Project YUSUFIYA 1-2
BAGHDAD |
Ministry
of
Agriculture |
93.2
|
1979
- 84 |
13
239 000
809 000
4 400 000
8 826
96.5
140 |
m3
m2
m3
m3
km
km |
Earthwork
Concrete lining
Land levelling
(11 150 ha Conventional irrigation)
Concrete
Road with A.C. pavement
Flume works |
Irrigation,
Drainage and Land Reclamation
KONYA |
DSI |
42.4 |
1976
- 79 |
13
800 000
1 200 000
11 000 000 |
m3
m3
m3 |
Canal
excavation
Concrete lining
Land levelling |
Oba
Creek Diversion
ANKARA |
DSI |
19.6 |
1968
- 69 |
12
951
745
156
5 221 |
m
m
m
m |
Diversion
channel
Siphon
Aqueduct
Tunnelling |
 |