Details |
Snake
- Pit PWHQ Upgrade
ANKARA
(60% of Kiska - ANO JV) |
MSB |
29.0 |
1997
- 00 |
1
112
45 000
27 000
11 760 |
m
m3
m3
m3 |
Tunnel (4 m dia.)
Open excavation
Tunnel excavation
Tunnel concrete |
Greenbelt Route Park
Road Tunnels
WASHINGTON DC
(40% of Kajima - Kiska JV) |
WMATA |
105.0 |
1994
- 98 |
2
x 3 200 |
lf |
Twin tunnels (16'8"
dia.) in soft ground
9" Precast segment initial lining
16" Final lining |
Greenbelt Route 14TH
St Tunnels
WASHINGTON DC
(60% of Kiska - Kajima JV) |
WMATA |
65.0 |
1994
- 97 |
2
x 3 200 |
lf |
Twin tunnels (16'8"
dia.) in soft ground
9" Precast segment initial lining
16" Final lining |
Shafts
21B - 22B for Tunnel 3 Stage 2
NEW YORK |
NY-DEP |
48.8 |
1992
- 94 |
199
.
178
|
m
.
m |
Shaft 21B : 12 - 7
m diameter
(soft ground freezing)
Shaft 22B : 12 - 4 m diameter
(soft ground freezing) |
Subway
Tunnels 2. Stage
ISTANBUL
(10% of Tekfen JV) |
Municipality |
206.4 |
1992
- 00 |
8
247
524 000
147 500
202 000
359 000
81 500 |
m
m3
m3
m2
m3
m3 |
Tunnel
(5.4 m dia.)
Excavation
Concrete
Shotcrete
Tunnel excavation
Tunnel concrete |
Halle
Tunnel
ADIYAMAN |
DSI |
4.1 |
1986
- 90 |
33
300
14 800
12 400 |
m3
t
m3 |
Tunnel excavation
Shotcrete
Concrete lining |
Camlidere
Water Supply Tunnels 1 - 2
ANKARA |
DSI |
30.7 |
1981
- 88 |
7
100
100 000
42 000
77 000 |
m
m3
t
m3 |
Tunnel
(3.4 m dia., in hard rock)
Tunnel excavation
Shotcrete
Concrete |
Storm
Water Drainage Tunnel & Canals
MAKKAH |
Ministry
of
Municipal &
Rural Affairs
(REDEC) |
88.5 |
1980
- 84 |
7
20
100 000
55 000
2 000
120
300 000
|
km
km
m3
m3
m
m
m3 |
Tunnel
Canal
Excavation
Concrete
Drilling 28" diameter hole
Sinking 7 m diameter shaft
Canal excavation with sheet piling |
Kinik
Water Supply Tunnel
ANKARA |
DSI |
213.8 |
1974
- 87 |
15
742
348
500 000
982 000
270 000 |
m
m
m3
m3
m3 |
Tunnel
(3.4 m dia., in soft rock)
Shaft
Tunnel excavation
Open excavation
Tunnel concrete |
Phosphate Research
Galleries
MAZIDAG |
ETIBANK |
2.2 |
1975
- 77 |
8
000 |
m |
Tunnel
(from 40 accesses) |
Transport Gallery
KURE |
KBI |
1.3 |
1972 |
341.5 |
m |
Tunnel
(completed in 3 months) |
Capali Lake Discharge
Tunnel
Dinar, AFYON |
DSI |
1.1 |
1970
- 72 |
1
108 |
m |
Water
tunnel with concrete lining |
Pipeline Tunnel
Murgul, ARTVIN |
KBI |
0.9 |
1969
- 70 |
2
107 |
m |
Tunnel
(in mountainous area) |
Tutupbeli
Tunnel
KONYA |
DSI |
12.2 |
1969
- 71 |
3
500
90 000
30 000 |
m
m3
m3 |
Tunnel
(4 m dia.)
Excavation
Concrete |
 |